About Us Calendar of Events Past Events Archives Seagrave Project Muster Featured Rig Members Links Contact Us
       
 

Ford  Restoration Project - Phase 3

1. The radiator is removed, pressure-tested, and painted,  and the engine is cleaned and painted “Ford Red”.   A good used set of exhaust manifolds are located, painted, and installed, along with all new exhaust pipes and a muffler.  (Can’t wait to hear the sweet purr of that flat-head V-8.)    

2. The Barton-American pump is partially disassembled, cleaned, primed, and painted.

3. The body is finished painted (3 colors – what a masking job!!) and pushed to the back of the shed for hardening.

4. The wheels, gas tank, and various other small parts are prepped and painted,  and set aside for future installation. 